Company Name Contact Info Location
AYYILDIZ TÜNEL EKİPMANLARI İMALATI MÜH. SAN. VE TİC. A.Ş.
FATİH MAH. SERDAROĞKLU SOKAK NO: 2/2 / KAHRAMANKAZAN / ANKARA / TÜRKİYE
Contact Info: +90 538 960 2122
Hall: 2
Stand: 207
Product Groups
  • Tunnel shaft and gallery machinery and equipment
  • Support machinery and equipment
  • Drilling machinery and equipment
  • Excavation machinery and equipment
  • Open Pit and Underground Mining

Our company has a total closed area of 35,000 m2, including the head office and 7 branches, 52 of which are engineers and technicians. with 249 personnel, registered high capacity machinery equipment and registered factory buildings. It operates in domestic and international projects by manufacturing. Our company; - One of the few companies with the Manufacturer Approval Certificate for the Akkuyu Nuclear Power Plant, which is under construction in Turkey has been carrying out the manufacturing and assembly of the nuclear power plant since the project started in 2018. Until the end of the project, with İÇTAŞ-TSM subcontractors approved by the Russian Rosatom Ministry of Energy. The contract continues. It is the only company that carries out manufacturing and assembly work together in the Akkuyu project. - Manufacturing and assembly supplier in the construction of Yusufeli Dam and Hydroelectric Power Plant, which is the pride of our country was included as. - Steel manufacturing and infrastructure works of tunnel and road constructions carried out by the leading construction companies of our country. While world giants such as Atlas Copco, Sandvik and Robit are market leaders, both within Türkiye and We created competition in exports. The products of the mentioned manufacturers are supplied to government institutions and contractors. While it is marketed to companies at very high prices, as a local subsidiary, the prices of fortification products are 5 times higher, We reduced consumables and machine spares by 2 times. On meter cost issues; With the right investment, R&D and planning, we left the unit costs of these giants behind. and we became preferred. - It produces electrical energy by converting waste into energy with its Biogas power plant and operates through Epiaş. Our country contributes to electrical energy. - TÜRASAŞ (Turkish Rail Systems Inc.) in the national freight wagon project being carried out in the Sivas region manufactures wagon chassis. These projects, which are followed by our President, are within the scope of the PPA. The tender was entered and won. - Again, TÜRASAŞ Sakarya regional directorate has undertaken the manufacturing of national passenger wagon parts and supply Completion of national passenger wagons within the targeted period without causing any disruption in the process It is the solution partner of our state. - It is also included in the high-speed train and electric train manufacturing, which continues to be localized by TÜRASAŞ. It follows the tenders to purchase it. - All steel structure manufacturing and installation of 20 overpasses on the Bursa-Eskişehir high-speed train line has been made. The remaining 5 bridges are continuing. - He provides steel manufacturing and project consultancy in the Turkish Financial Center project built in Istanbul. - Exports its own manufactured products to a total of 40 countries, including the United States It does. - An important machiner

LATTICE GIRDER / PROFILE ARCHESTunnel
PRODUCT DESCRIPTION:

The Profile Arch is used for the construction of segmental arches in brickwork. The unit must always be used in conjunction with a suitable steel lintel to provide adequate support.

SPLIT SETSPLIT SET
PRODUCT DESCRIPTION:

Split Sets are an effective solution for rock support and stabilization in different fields of application, from mining to tunnel construction and infrastructure works: Underground mining: In underground mining,

UMBRELLA ARCH SYSTEMUMBRELLA ARCH SYSTEM
PRODUCT DESCRIPTION:

Umbrella Arch Method (UAM) or Forepole is a conventional and economical method in tunnel excavation, and is in use to increase the excavation front sustainability, minimize the land subsidence, and prevent debris rocks falling, tunnel faces breaking and landslides.

ROCK BOLTROCK BOLT
PRODUCT DESCRIPTION:

Rock bolt is widely used in underground mining to provide support to the roof or sides of the cavity. It can be used in any excavation geometry and it is simple and quick to apply, and is relatively inexpensive. The installation can be fully mechanized.

SELF-DRILLING ANCHORsSDA
PRODUCT DESCRIPTION:

Self drilling anchor system is a type of ground anchor used to provide stability in soil or rock formations. The system typically consists of a hollow anchor bar with a drill bit on one end and a coupling on the other. During installation, the drill bit is used to bore a hole into the ground while simultaneously injecting grout into the hole to fill any voids. The anchor bar is then inserted into the hole and the grout is allowed to set, creating a bond between the anchor and the surrounding ground. This creates a stable foundation that can support a variety of structures and engineering projects. Self drilling anchor systems are commonly used in construction, mining, and tunneling applications.

CABLE BOLTCABLE BOLT
PRODUCT DESCRIPTION:

Rock bolts have been used for many years as temporary roof support in the mining industry and for tunneling, and are now used routinely for stabilizing roadcuts, rock cliffs, steep slopes, bridge abutments, and reinforced concrete dams.

No represented companies found.

The company has no registered brand information.